    4. Vermont Farmhouse: Framing and Wiring for the Future

    24 Sept 2001

    Framing continues, while in the basement installers put in special wiring to make this farmhouse a "connected home". Also: a tour of NASA's Johnson Space Center in Houston, Texas.

  2. 5

    5. Vermont Farmhouse: Exterior Update

    1 Oct 2001

    Metal roofing installation is underway, and the redwood deck is constructed. Included: trimwork on the porch and lessons in farming.

  3. 7

    7. Vermont Farmhouse: Exterior Painting and Kitchen Cabinet Installation

    15 Oct 2001

    Painting has begun on the exterior, while custom cabinets are installed in the kitchen. Also: a tour of Crown Point factory in Claremont, NH.

  4. 8

    8. Vermont Farmhouse: Finish Trim and Cabinet Installation

    22 Oct 2001

    Trim work is completed in the living room and the fireplace is installed. A window and vanity are added to the master bath.

  5. 9

    9. Vermont Farmhouse: Stone Wall Construction and Covered Bridges

    29 Oct 2001

    Exterior work continues with construction of a new stone wall. Inside the farmhouse, a staircase is built. Also: a look at the heritage of covered bridges in VT.

  6. 10

    10. Vermont Farmhouse: Connected Home Update and Garage Doors

    5 Nov 2001

    Work continues in the garage, while home automation solutions are explored inside the residence.

  7. 11

    11. Vermont Farmhouse: Kitchen Update and Bathroom Tile Installation

    12 Nov 2001

    Bob Vila catches up on progress in the home's kitchen, where new appliances have been installed. In the bathroom, tile is applied.

  8. 12

    12. Vermont Farmhouse: Home Entertainment and Carpet Installation

    19 Nov 2001

    Landscape work begins; inside, carpet is laid down and a new entertainment center is installed. Special appearance: model and designer Kathy Ireland.

  9. 13

    13. Vermont Farmhouse: Project Completion

    26 Nov 2001

    Bob Vila takes a final tour of the completed farmhouse project, paying special attention to the landscaping, home automation features, and interior design.

  10. 14

    14. Victorian Restoration: Initial Tour

    3 Dec 2001

    This ambitious restoration project involves renovating a Victorian home as well as a former dairy barn also on the property.

  11. 15

    15. Victorian Restoration: Exploring the Barn and Demolition

    10 Dec 2001

    Bob Vila focuses on the barn, a former dairy storage building that will be converted into an artist's studio and office space.

  12. 16

    16. Victorian Restoration: Moving the Entrance and Kitchen Layout

    10 Dec 2001

    The front door is relocated to accommodate a new larger entranceway, while the design for the kitchen is determined. Also: a tour of Isaac Royall House.

  13. 17

    17. Victorian Restoration: Electrical Systems and Wiring and Upstairs Framing

    24 Dec 2001

    Rough electrical work is in progress, framing is underway on a new addition, and a new tub and new windows are installed.

  14. 18

    18. Victorian Restoration: Roof Work and Lighting

    31 Dec 2001

    The barn's roof system gets a makeover, while the interior gets air conditioning. Shingles are added to the exterior, along with a new gutter system.

  15. 19

    19. Victorian Restoration: Skylight Installation, Roofing, and Painting

    7 Jan 2002

    A tubular skylight is installed, along with new triangular peak windows. Also, exterior painting gets underway.

  16. 20

    20. Victorian Restoration: Barn Insulation, Video Wiring, and a New Balcony

    14 Jan 2002

    Cellulose insulation is installed, and construction of the second-floor balcony begins.

  17. 21

    21. Victorian Restoration: Blue Board Installation, Landscaping, and a New Garage Door

    21 Jan 2002

    The differences between blue board and drywall are discussed, and special fencing is put in. Also: a tour of the factory where the fencing is made.

  18. 22

    22. Victorian Restoration: Work On the Driveway and Finishing the Deck

    21 Jan 2002

    Stone pavers are installed in the driveway and deck construction begins. Plaster is applied in the bedrooms, and new barn-style doors are installed in the converted dairy storage building.

  19. 23

    23. Victorian Restoration: Flooring, Glass-Block Walls and Floors, and Water Filtration

    28 Jan 2002

    An interlocking laminate floor system being installed, along with a glass-block wall in the master bath and glass-block flooring elsewhere. The water filtration system is also established.

  20. 24

    24. Victorian Restoration: Landscaping Begins, Flooring Continues, and Water Heater Installed

    4 Feb 2002

    Landscaping gets underway on the Victorian restoration project house property.

  21. 25

    25. Victorian Restoration: Cabinets, Countertops, and Closets

    18 Feb 2002

    Cabinets and countertops are installed in the kitchen. In the master bedroom, a custom closet system is designed.

  22. 26

    26. Victorian Restoration: Final House Tour

    25 Feb 2002

    The Victorian house in Medford, MA is complete, and Bob Vila guides a tour of the finished restoration, from the pergolas in the yard to the electronics in the home office.

Home Again with Bob Vila Season 12: quick answers

How many episodes are in Home Again with Bob Vila Season 12?

Season 12 of Home Again with Bob Vila has 22 episodes.

↑ ↓ to move · Enter to open · Full search page